GNSS on two CAN FD ports. Each has its own power stage, ground and transceiver, so a fault on one bus stays on that bus, and the module runs from either port's power.
AGS-G1
Dual-port DroneCAN RTK GNSS module
One module serves two autopilot buses: it publishes RTK GNSS on two isolated CAN FD ports, each guarded in hardware. A pair of modules gives heading without a magnetometer. Nothing is built yet, so every value on this page is a design value or a target.
For integrators of redundant UAS, and of survey aircraft that carry magnetometers.
One antenna, two buses.
A drawing, not a photograph. Each port is its own CAN FD bus.
Designed for aircraft that cannot trust one bus.
A MUTE input on each port lets the autopilot on that bus silence the module's port in hardware, without relying on the module's firmware.
Two modules, strapped base and rover in the harness, report heading over DroneCAN without a magnetometer.
Designed from low-magnetic parts. Every unit will be measured on the fluxgate bench we use for the AGS-M1, and no figure is published until the first one is.
Jamming state, antenna status, spoofing indicators and Galileo OSNMA status go to the autopilot, not only to a log. The receiver cannot flag spoofing already present at start-up, so a spoofing state of "none" must never be read as "authentic".
1 Gbit of flash records the receiver's raw observations independently of the autopilot, for post-processed positioning and a record of the RF environment.
ArduPilot's secure bootloader is on by default, and the module runs only firmware signed with a key the bootloader holds. As standard, those are our key and ArduPilot's; on order, just your key and ours.
The firmware is ArduPilot's AP_Periph under GPLv3, and the board definition goes upstream to ArduPilot. The hardware design is ours.
GNSS designed to fly beside a magnetometer.
An aircraft that carries a magnetometer needs everything near the sensor to add as little field as possible. Measuring that field is the work we already do with the AGS-M1.
THE AGS-M1 BOARD →What it is designed to be.
| PARAMETER | VALUE | EVIDENCE |
|---|---|---|
| GNSS | ||
| Receiver | u-blox ZED-F9P-05B, multi-band RTK | DESIGN |
| Heading | From a pair of modules strapped base and rover, over DroneCAN; no magnetometer | DESIGN |
| Timing | PPS on each port as a differential pair, driven from the receiver's time pulse | DESIGN |
| Authentication | Galileo OSNMA status reported to the autopilot | DESIGN |
| PORTS AND POWER | ||
| CAN ports | Two CAN FD ports, each on two DroneCAN JST-GH connectors and a 7-pin aux connector | DESIGN |
| Isolation | Each port isolated from the other: its own power stage, ground and transceiver | DESIGN |
| Transmit guard | A MUTE input on each port silences that port in hardware | DESIGN |
| Identity | Node ID and base or rover role from a strap in the harness | DESIGN |
| Supply | 5 V DroneCAN bus power on each port, designed for 4.55–5.5 V at the connector; runs from either port | DESIGN |
| Power | About 1.5 W in typical use at 5.5 V, a design estimate | DESIGN |
| RECORDING AND FIRMWARE | ||
| Raw recorder | 1 Gbit for raw observations, independent of the autopilot; about 18 h at 1 Hz, estimated | DESIGN |
| Interference | Jamming state, AGC, spoofing indicators and antenna status sent to the autopilot | DESIGN |
| Firmware | ArduPilot AP_Periph, GPLv3; the board definition goes upstream | DESIGN |
| Signed firmware | Secure bootloader on by default, holding our key and ArduPilot's; on order, just your key and ours | DESIGN |
| PHYSICAL | ||
| Form | A bare board, conformal-coated, with no enclosure | DESIGN |
| Antenna | One non-magnetic SMA; the active antenna's supply is supervised for open and short | DESIGN |
| Mass | Target under 20 g | DESIGN |
| Mounting | Target 30.5 × 30.5 mm hole pattern, for M3 | DESIGN |
| Magnetic signature | Not yet measured. Every unit will be measured on our fluxgate bench | OPEN |
| Operating temperature | Not yet specified. A bench thermal test in still and moving air sets it | OPEN |
From parts to a first unit.
Design started in October 2026. The main parts are chosen, and the schematic is the current step.
Gates
2 OF 7 CLOSED- Board definition builds, secure bootloader included2026-10-13 DONE
- Main parts chosen2026-11-15 DONE
- Schematic ACTIVE
- Layout OPEN
- First units built OPEN
- Magnetic signature measured OPEN
- Bench thermal test OPEN
We are looking for design partners.
Integrators who will help shape the module and test the first units. Tell us about your aircraft and its buses: king@airandgravity.com